Reservoir Permeability Modification Agent(WZJ016)
Name: Reservoir Permeability Modification Agent
Other Name: Reservoir Permeability Modification Agent, water lock removal agent
Model No:WZ016
Chemical composition:cationic surfactant, wettability alteration, mixed acid, corrosion inhibitor
Contact Us
Add to Cart
The well condition before water lock removal:
1. Wells that can't restore production because of the invasion of foreign liquids during workover.
2. Wells that can't restore production because of the improvement of reservoir water saturation during long-term
shut-in which leads to severe water lock.
3. Gas-water production wells and its output of water is less than 3m3 per day.
4. Wells and its original formation permeability is less than 10 to 4 um2 .
The results of water lock removal:
1. Restored of reservoir capacity
2. Increased the yield of gas- water production wells.
3. Prolonged the production cycle of gas-water production wells and improved recovery ratio.
4. The input and output ratio is greater than 1:10.
4. Packaging And Storage200KG plastic drum;
Keep in a cool and dry place. prevent the rain and sunshine. The shelf life is two years


未标题-5